Application context
Use this project experience to prepare your requirements.
For a similar application, start with your water analysis, required output and quality at the point of use. These inputs determine the equipment scope, storage, controls and acceptance criteria for your proposal.
Capacity basis
Production flow and operating schedule
Water challenge
Conditions that control the process.
Process-water purity requirements for the manufacture of a bioactive ingredient.
Target water use and quality
Set the objective at the point of use.
High-purity process water defined around the production requirement.
Typical treatment train
- 01Multimedia filtration
- 02Activated-carbon filtration
- 03Softening
- 04Double-pass reverse osmosis
- 05Electrodeionization (EDI)
Main equipment and components
- Multimedia and activated-carbon filters
- Softening equipment
- Double-pass RO system
- EDI system
Configurable options
- Storage and distribution materials
- Duty/standby generation
- Monitoring and sanitization interfaces
Utilities and operating assumptions
- Stable electrical supply and feed pressure
- Drain and concentrate route
- Cleaning and sanitization access
Required customer inputs
- Approved water-quality basis
- Use-point flow profile
- Validation, documentation and material requirements